Skip to Content Skip to Navigation

Amusement Device Detials

The New York State Department of Labor inspects all amusement devices on or before the scheduled start date of an event. Only those devices deemed safe are allowed to operate. Detailed inspection results for each individual device will be posted within two weeks of the event start date.

For more information, look at our Frequently Asked Questions.

Details for device: Speed Slides

Violation Summary

Violations Issued This Season: 6 Violations Complied at Time of Inspection: 0
Speed Slides Violations
Date Cited Description Violation
6/19/2017 Tighten the cross member support that goes between the main wood beams. Located under the Twister slide that is marked with a double orange flag45-1.6(b)
45-1.6(b)Assembly work shall be performed in a proper and workmanlike manner. Parts shall be properly aligned, and shall not be bent, distorted, cut or otherwise injured to force a fit. Parts requiring lubrication shall be lubricated in course of assembly. Fastening and locking devices, such as bolts, cap screws, cotter pins, lock washers, etc. shall be installed where required. Nuts shall be drawn tight, cotter pins shall be spread and lock nuts firmly set.
6/19/2017 Replace the multiple broken screws in the flat section of the Twister slide that secure the slide to the wood board on the concrete.45-1.6(c)
45-1.6(c)Parts which are excessively worn or which have been materially damaged shall not be used. Close visual inspection of parts shall be made during assembly to discover such wear or damage and immediate inspection of fastening devices shall be made after assembly to assure that they have been properly installed.
6/19/2017 Replace the multiple broken screws in the flat section of the Cliff slide that secure the slide to the wood board on the concrete.45-1.6(c)
45-1.6(c)Parts which are excessively worn or which have been materially damaged shall not be used. Close visual inspection of parts shall be made during assembly to discover such wear or damage and immediate inspection of fastening devices shall be made after assembly to assure that they have been properly installed.
6/19/2017 Repair the loose metal mid rail in the metal handrail for the entrance line. Just over half way down, its marked with a orange flag.45-2.13(b)
45-2.13(b)Stairways, landings and ramps shall be designed, constructed and maintained so as to sustain safely a live load of at least 90 pounds per square foot.
6/19/2017 Repair/Replace the three loose handrail spindles located on the stair tower has flagged.45-2.13(b)
45-2.13(b)Stairways, landings and ramps shall be designed, constructed and maintained so as to sustain safely a live load of at least 90 pounds per square foot.
6/19/2017 Reattach the ground wire that has come off the handrail base on the short section of metal handrail to the left of Twister slide end.45-2.21(h)
45-2.21(h)Temporary electric installations shall be properly grounded.

View All Events Listing

Thanks for the feedback! It will help us improve your experience.