Skip to Content Skip to Navigation

Amusement Device Detials

The New York State Department of Labor inspects all amusement devices on or before the scheduled start date of an event. Only those devices deemed safe are allowed to operate. Detailed inspection results for each individual device will be posted within two weeks of the event start date.

For more information, look at our Frequently Asked Questions.

Details for device: Haunted House

Violation Summary

Violations Issued This Season: 2 Violations Complied at Time of Inspection: 0
Haunted House Violations
Date Cited Description Violation
10/4/2017 Add emergency lighting to all dark rooms where secondary lighting doesnt illuminate.45-4.3(d)
45-4.3(d)Emergency lighting. Each building or structure shall be equipped with an emergency lighting system conforming to the requirements of Part 1032, of Title 9 NYCRR Emergency Power and Lighting, of the New York State Uniform Fire Prevention and Building Code, effective January 1, 1984. In addition, the emergency lighting system shall be automatically activated by the operation of the fire and smoke detection system required under subdivision 45-4.3(e) of this Subpart.
10/4/2017 No Smoking sign needs to be posted at entrance to building.45-4.3(g)
45-4.3(g)Smoking prohibited. The carrying of lighted cigars, cigarettes or pipes shall be prohibited in any building or structure subject to the provision of this Subpart. NO SMOKING signs shall be posted at all entrances to such building or structure.

View All Events Listing

Thanks for the feedback! It will help us improve your experience.