Skip to Content Skip to Navigation

Amusement Device Detials

The New York State Department of Labor inspects all amusement devices on or before the scheduled start date of an event. Only those devices deemed safe are allowed to operate. Detailed inspection results for each individual device will be posted within two weeks of the event start date.

For more information, look at our Frequently Asked Questions.

Details for device: House of Pain

Violation Summary

Violations Issued This Season: 3 Violations Complied at Time of Inspection: 3
House of Pain Violations
Date Cited Description Violation
10/5/2017 Remove all plastic that is not flame retardant rated in the haunt.45-2.23(a)
45-2.23(a)Fabrics constituting part of an amusement device or a temporary structure shall be fire-resistant to meet the following standard: two dry strips or test sections either of the fabric used or of other fabric identical therewith shall be tested. Each strip shall be not less than 1 inches wide and 4 inches long. The two test strips or sections shall be held with the long axis vertical and an open flame shall be applied to the center of the bottom edge for 12 seconds. The test strip or section shall not flame for more than two seconds after the flame is removed; the average length of char shall not exceed the length of the strip nor more than four inches for sections. Such a test is not required by this subdivision if other evidence of the required degree of fire resistance is accepted by the Commissioner as sufficient.
10/5/2017 Place low level path markings in areas were the exit signs are not visible.45-4.3(c)(4)
45-4.3(c)(4)Exit directional signs and exit path marking. Low level exit path marking placement. The low level exit path marking shall be located at floor level or no more than eight inches above the floor level on or near the exit path.
10/5/2017 Mark the floor at the downward slope in the floor in the room just before the turning tunnel.45-4.3(c)(4)
45-4.3(c)(4)Exit directional signs and exit path marking. Low level exit path marking placement. The low level exit path marking shall be located at floor level or no more than eight inches above the floor level on or near the exit path.

View All Events Listing

Thanks for the feedback! It will help us improve your experience.