Skip to Content Skip to Navigation

Amusement Device Detials

The New York State Department of Labor inspects all amusement devices on or before the scheduled start date of an event. Only those devices deemed safe are allowed to operate. Detailed inspection results for each individual device will be posted within two weeks of the event start date.

For more information, look at our Frequently Asked Questions.

Details for device: Paratrooper

Violation Summary

Violations Issued This Season: 6 Violations Complied at Time of Inspection: 5
Paratrooper Violations
Date Cited Description Violation
6/16/2017 Insert r key into leg stabilizing pin45-1.6(b)
45-1.6(b)Assembly work shall be performed in a proper and workmanlike manner. Parts shall be properly aligned, and shall not be bent, distorted, cut or otherwise injured to force a fit. Parts requiring lubrication shall be lubricated in course of assembly. Fastening and locking devices, such as bolts, cap screws, cotter pins, lock washers, etc. shall be installed where required. Nuts shall be drawn tight, cotter pins shall be spread and lock nuts firmly set.
7/7/2017 Install safety between tubs 2 and 3.45-1.6(b)
45-1.6(b)Assembly work shall be performed in a proper and workmanlike manner. Parts shall be properly aligned, and shall not be bent, distorted, cut or otherwise injured to force a fit. Parts requiring lubrication shall be lubricated in course of assembly. Fastening and locking devices, such as bolts, cap screws, cotter pins, lock washers, etc. shall be installed where required. Nuts shall be drawn tight, cotter pins shall be spread and lock nuts firmly set.
8/11/2017 Ensure entry and exit gates do not swing open during operation.45-1.6(b)
45-1.6(b)Assembly work shall be performed in a proper and workmanlike manner. Parts shall be properly aligned, and shall not be bent, distorted, cut or otherwise injured to force a fit. Parts requiring lubrication shall be lubricated in course of assembly. Fastening and locking devices, such as bolts, cap screws, cotter pins, lock washers, etc. shall be installed where required. Nuts shall be drawn tight, cotter pins shall be spread and lock nuts firmly set.
8/11/2017 Ensure exit gate swings out.45-1.6(b)
45-1.6(b)Assembly work shall be performed in a proper and workmanlike manner. Parts shall be properly aligned, and shall not be bent, distorted, cut or otherwise injured to force a fit. Parts requiring lubrication shall be lubricated in course of assembly. Fastening and locking devices, such as bolts, cap screws, cotter pins, lock washers, etc. shall be installed where required. Nuts shall be drawn tight, cotter pins shall be spread and lock nuts firmly set.
8/4/2017 Do not load tub 9 until passenger restraint mechanism is working and automatically springs shut.45-1.6(c)
45-1.6(c)Parts which are excessively worn or which have been materially damaged shall not be used. Close visual inspection of parts shall be made during assembly to discover such wear or damage and immediate inspection of fastening devices shall be made after assembly to assure that they have been properly installed.
7/7/2017 Ensure loading ramp is properly supported.45-2.13(b)
45-2.13(b)Stairways, landings and ramps shall be designed, constructed and maintained so as to sustain safely a live load of at least 90 pounds per square foot.

View All Events Listing

Thanks for the feedback! It will help us improve your experience.