Skip to Content Skip to Navigation

Amusement Device Detials

The New York State Department of Labor inspects all amusement devices on or before the scheduled start date of an event. Only those devices deemed safe are allowed to operate. Detailed inspection results for each individual device will be posted within two weeks of the event start date.

For more information, look at our Frequently Asked Questions.

Details for device: Generator

Violation Summary

Violations Issued This Season: 2 Violations Complied at Time of Inspection: 2
Generator Violations
Date Cited Description Violation
5/10/2017 Install ground rods with correct wire clamp.45-1.6(c)
45-1.6(c)Parts which are excessively worn or which have been materially damaged shall not be used. Close visual inspection of parts shall be made during assembly to discover such wear or damage and immediate inspection of fastening devices shall be made after assembly to assure that they have been properly installed.
8/3/2017 The grounding rods were not at least six feet apart. Reinstall a grounding at least 6 ft. distant.45-2.21(k)
45-2.21(k)Where electrical power is supplied for an amusement device or a temporary structure by a privately operated generating system, the generator and all equipment shall be grounded as required by NEC-1999.

View All Events Listing

Thanks for the feedback! It will help us improve your experience.